Common Description
Equipped with the zero leak bidirectional checking sole-noid valves, this electrical power unit is created for your operation of two independent circuits. Which are respectively for your key and subordinate platforms on the double scissors lift. Two cut-off valves are used for reducing the machine manually in situation of power reduction. If much more independent circuits are needed for the application please get hold of us for availability.
Remark: 1. Please consult our revenue engineer for your distinctive pump displacement, motor power or tank capability.
two. CSA or UL certified motors are available on request.
Specific Notes
one. The AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean each of the hydraulic elements concerned just before installation of the energy unit.
3. Viscosity on the oil shoud be 15~46 cst,plus the oil really should be clean and cost-free of impurities,N46 hydraulic oil is recommended.
4. The power unit should really be mounted vertically.
five. Check the oil degree in the tank soon after the first working of the energy unit.
six. Oil modifying is required immediately after the initial 100 operation hrs,afterwards as soon as every single 3000 hours.